Save The Webpage | Make As Homepage | Browse
Common Member

Jinzhou Tiegong Railway Maintenance Machinery Co., Ltd.

Railway equipment, test equipment manufacturing, mechanical processing

Product Categories
Site Search
 
Friendly Links
  • Link Unavailable
Current Location:Home Page » Products » track crane trolley
track crane trolley
Click For Large Image
product/Service: Browsing Times:902track crane 
Type: DC 
Brand: Jinzhou Tiegong 
Unit Price: Negotiable 
Minimun Order Quantity: 1 sets 
Total Supply:
Deliver Deadline: Once finish the payment 5cargo will be delivered in days
Update Date: 2012-07-09  Period Of Validity To:Long Term Validity


«Last Product     Next Product»
Detail Information


A, characteristics

DC type crane rail car, the structure is simple, light weight, easy to use, transport rail flexible reliable, is the railway works departments rail transport construction operation ideal special tools.

Second, the technical parameters

1, crane rail rated load: 1 T

2, the contour size, long x width × high: 3080 x 1020 x 1020 mm

3, the machine quality: 77 kg


Three, principle, structure

Principle: based on the principle of balance of leverage, through the hinge card (crane) hook will rail rail palatal parts card (clip) live, again with wheel tread and rails for supporting points at the top of the press operation lever, will lift the rail, and then, the side pressure helped operation lever, the side push rod operation, will need to place to rail removed.

Structure: by the card (crane) rail hook, running wheel, the rail device rack (operation lever, mandrels, the horizontal axis, etc) composition.

Four, use and maintenance

1, using radio 2 or more crane rail car, first will hang rail car wheels placed to ZouHangXian road on the rails, wheel tread and rails top surface contact, put steadily.

2, make card (crane) hook open, put in place to hang immediate rail, clamped rail rail palate, hang down rail car operation pole, which is of the lifting up of rail, smooth, side pressure helped push the operation will stem rail line along the railway).

3 and when will need to the position of the rail, lift up operation lever, rail be born the assignment.

4, before landing rail, should slow up up the operation stem, in case of operating rod suddenly raise cuts.

5, the wheel of the rolling bearing shaft supporting heart combination, and replace the grease injection to regularly; Hook the hinge pin shaft, want to often injecting grease, in order to protect crane rail car running flexible and not rust.

6, when for shipment rail line distance is farther, should first will move to be shipped to line near the rail, make the crane rail car card hook can hook position.



 


total0条  Relative Comment